YACHT BUILD AGREEMENT

添加時間:2017-11-26 23:59:50
瀏覽次數: 0
  dated: ______________________
  between 
  ______‘s yacht company limited, hong kong. (hereinafter referred to as “the builder”)
  and 
  bbb cc, vietnam, (hereinafter referred to as “the buyer”)
  whereas:
  1) the buyer wishes to acquire a aaa‘s cape 65 trawler yacht (the yacht) designed by thanos condylis, and built to the buyer’s stated requirements and specification, and the builder has the capability, knowledge and skills to build and supply the same.
  2) the builder has agreed to construct, equip, fit-out, test and deliver the yacht to the buyer‘s stated requirements and specification, which the buyer has agreed to accept upon the terms and conditions here in after specified:
  now therefore the parties hereto have agreed and do hereby agree as follows:
  article i - interpretation
  1) in this contract the following words and expressions shall have the meaning hereby ascribed to them, except where the context otherwise admits or requires:
  “banking days” shall mean days upon which hong kong clearing banks are customarily open for business.
  “the builder‘s clarifications” shall mean the documents so entitled forming part of this contract and set out as annexes hereto; (see also item (2) of this article.)
  “buyer‘s representative(s)” shall mean such persons notified from time to time by the buyer as having authority to act for the buyer, the extent of such authority being set out in the notice;
  “items of buyer‘s supply” shall mean any item of equipment and stores for the yacht ordered by the buyer direct from the manufacturer or the supplier, for incorporation in the yacht by the builder;
  “items of builder‘s supply” shall mean any item of equipment and stores for the yacht ordered by the builder direct from the manufacturer or the supplier, for incorporation in the yacht;
  “the certifying / survey body” shall mean the body responsible for the survey and certification of the yacht to the requirements of the buyer.
  “the contract” shall mean (a) this contract, and (b) the attached annexes and schedule more particularly described below.
  “the contract delivery date” shall mean no later than ________;
  “the contract master programme” shall mean the programme for construction of the yacht, set out in annex d;
  “the contract price” shall mean the price stipulated in article v for the yacht, yard number 005;
  “the yacht” shall mean the yacht the subject of this contract and generally as described in article ii, with all the machinery, apparatus, outfit, materials, and equipment appurtenant thereto, but excluding the items of buyer‘s supply. “the boatyard” shall mean aaa‘s yacht company, xinhui, china.
  “the design specifications” shall mean the specifications, designs, plans and drawings, set out in schedule a, prepared and signed by the buyer, identified as forming part of this contract, and including such revised or supplemental specifications, plans and drawings as may subsequently be agreed between the buyer and the builder provided that (i) in the case of any inconsistency between any article or paragraph of this contract and the design specifications, this contract shall prevail, (ii) in the case of any inconsistency between the design specifications and a plan or drawing, the design specification shall prevail, and (iii) in the case of any inconsistency between one plan or drawing and another plan or drawing, the later in date shall prevail;
  'schedule a' shall mean the agreed schedule of drawings
  “annex a” shall mean the list of materials, components and equipment defining a completed yacht;
  'annex b' shall mean the agreed weld quality procedures 
  “annex c” shall mean the agreed shot blasting, fairing, painting and foaming specifications
  'annex d“ shall mean the agreed production schedule master program.
  “specified” shall mean stipulated in the specifications and annex a;
  “supplier” shall mean any person, firm or company, which has entered into a contract with the builder for the supply of materials, machinery, services or equipment (other than items of buyer‘s supply) for the yacht;
  the index, article and paragraph headings, are inserted for convenience only and shall not affect the construction of this contract.
  words importing the singular shall include the plural and vice versa.
  2) list of builder‘s clarifications, not covered in annex a document:
  “cradles for transport” the supply of a cradle for shipment is excluded from this contract.
  “dressing/stepping the mast” the dressing and stepping of mast for the yacht is included in the builder‘s supply.
  “storage” the builder will arrange secure storage ashore for the yacht at the boatyard between completion of build and handover at delivery.
  “fabrication” the builder will supply steel in pre-cut form with a test certificate in accordance with the builder‘s production and quality plan. 
  “welding” the contract is based on ndt (non destructive testing) being conducted to the standards required by det norske veritas class rules for yacht and small craft, including 100% visual examination. radiography will be completed where appropriate, at the builder‘s cost.
all welding will be carried out in accordance with the quality plan and iso weld procedures approved by the buyer‘s representative and will be in general accordance with det norske veritas requirements.
  “shot blasting” shot blasting of the yacht will be in accordance with the agreed specification attached in annex c.
  “insulation” the insulation of the yacht will be in accordance with the agreed specification attached in annex c.
  “fairing and painting” the fairing and painting of the yacht will be in accordance with the coatings specification attached in annex c.
  “equipment” the responsibility for the supply of materials and equipment will be as defined and agreed in the components list (annex a) for the yacht.
  “quality plan documentation” an agreed quality plan will be issued covering all aspects of the yacht‘s construction, which will include: 
  a) hull & deck fabrication
  b) blast and prime
  c) fair and paint
  d) electrical and mechanical engineering
  e) fit-out
  article ii – description
  1) the yacht to be constructed under this contract is a motor yacht of approximately 20.00 metres length overall designed by thanos condylis, as described in the specifications, with the following main particulars:
  approximate dimensions
  length overall about 20.00 metres
  length on the water line about 18.03 metres
  beam (max) about 5.75 metres
  draft about 1.77 metres
  2) a distinctive yard number shall be placed upon each yacht and her materials and outfit, during construction. the yard number of the yacht shall be kyc-005.
  article iii – construction, materials and inspection
  1) the yacht and her machinery, outfit, equipment, materials and workmanship shall be in accordance with this contract and the design specifications.
  2) in principle the builder will supply all material, components and equipment for the yacht as set out in annexe a. any additional material, components or equipment procured by the builder will be billed to the buyer at delivered cost plus 15%. however the builder must notify the buyer in writing prior to procurement of the cost and quantity of any items for which the builder intends to be billed to the buyers account.
  3) in the event of any delay of delivery of material, components and equipment which are items of buyer‘s supply, by the buyer resulting in delays to the production schedule set out in annexe e, the contract delivery period may be extended by the amount of the delay. provided always that the builder will use his best endeavours to minimise the delay so caused by re-scheduling work to utilise the material, components and equipment that have already been delivered to the builder.
  4) if any specified materials are not available when required for incorporation on the yacht, the builder shall be at liberty to use other suitable materials in substitution therefore, subject to the approval of the buyer, which approval shall not be unreasonably withheld. any adjustment to the contract, delivery date or design specification resulting from such substitution shall be made in accordance with the provisions of article iv.
  5) during construction of the yacht, the builder will permit the buyer‘s representative to attend the tests specified in article viii and to have access to the boatyard during ordinary working hours while work is proceeding on the yacht. the builder must give reasonable notice of such tests to the buyer’s representative in writing. the builder will use its reasonable endeavours to arrange for the buyer‘s representative to have access to the premises of the builder's subcontractors for the purpose of inspecting materials and workmanship. if, during construction, the buyer or his representative alleges any defect or omission in the yacht they shall, if required by the builder, immediately specify the same in writing. if the builder agrees that there has been a defect the builder will at its own cost, before delivery, rectify the same.
  6) the build will be subject to regular inspections by the buyer. accommodation, meals and entertainment in china for the buyer‘s staff that are paid for by the builder, will be invoiced to the buyer at cost. the buyer will cover his own travel costs to and from the boatyard.
  7) the builder undertakes to provide a suitably qualified (english speaking) marine engineer to act as a liaison person with the buyer throughout the duration of this contract.
  8) where practical the builder shall take and make available to the buyer, digital photographic evidence of all construction, painting and fit out stages during the yacht‘s build. such digital information will be sent to the buyer or the buyer’s representative by electronic means and at such frequency to allow the buyer or the buyer‘s representative to monitor the course of the yacht’s build. 
  9) the materials, components and equipment for the yacht (as detailed and agreed on the component supply list in annex a) that are the builder‘s supply will be shipped to the boatyard by the builder at his expense. shipping costs of items of buyer’s supply will be at the buyer‘s cost together with associated export and import procedures, duties and insurance.
  10) the builder‘s premises shall have the necessary facilities and equipment to construct the yacht to the agreed standards and specifications. the facilities and equipment will include shot blasting equipment, airless spray equipment, bolt welding capacitor, heavy duty pulse mig welding equipment and environmental monitoring equipment capable of providing a record of temperature, humidity and dew point.
  article iv – modifications  
  1) at any time prior to delivery of the yacht the buyer through the buyers' representative may request, in writing, modifications or   additions to or deletions from the design specifications and schedule a.
  the builder shall not be obliged to accede to any request under this paragraph (1) unless:
  i) it is reasonable and practicable for the builder to do so having regard to the stage of construction which the yacht has reached and to the builder‘s boatyard programme;
  ii) the parties shall first agree in writing in relation to such modifications, additions, or deletions:
 ?。?) any increase or decrease in the contract price and variation of the payment terms for the yacht;
  (2) any extension of the contract delivery date;
 ?。?) any alteration of the terms of this contract or the design specification or annex a.
provided that the builder shall be entitled to continue production in accordance with the design specifications and schedule a until agreement has been reached as provided in this sub-paragraph ii)。
  2) the builder shall not make changes in constructional details or materials of the yacht without the agreement of the buyer in writing.
  article v – price and terms of payment
  the builder has agreed to complete the construction, outfit and delivery of the yacht for the buyer on the following terms.
  1. the contract price for the yacht will be us$850,000 (eight hundred and fifty thousand us dollars)
  2. payment of the firm price for the yacht, shall, subject to paragraph 3) hereof be made in instalments from the buyer to the builder as follows:
  instalment event
  a) initial deposit of us$127,500 (one hundred and twenty seven thousand five hundred) payable on the signing hereof.
  b) upon arrival of all structural building materials in the boatyard, us$127,500 (one hundred and twenty seven thousand five hundred)
  c) on satisfactory completion of the yacht‘s structural steel work us$127,500 (one hundred and twenty seven thousand five hundred)
  d) on satisfactory completion of the yacht‘s interior painting and insulation stages, substantial completion of the yacht’s interior furniture built off the yacht, and at the start of fit out, us$127,500 (one hundred and twenty seven thousand five hundred)
  e) on satisfactory completion of the yacht‘s exterior painting stages, us$127,500 (one hundred and twenty seven thousand five hundred)。
  f) on satisfactory installation of the yacht‘s engines, generators and main engine room systems, together with installation of the fly bridge structure, us$127,500 (one hundred and twenty seven thousand five hundred)。
  g) on delivery and final acceptance of the yacht by the buyer us$85,000 (eighty five thousand)。
  2) the builder shall, by not less than fourteen days notice in writing, advise the buyer of the date upon which each instalment of the contract price shall become payable.
  (i) subject to the builder‘s compliance with the notice provisions of the foregoing paragraph, each of the said instalments shall become due and payable upon the appropriate instalment event, subject to receipt by the buyer of the builder’s invoice thereof, accompanied by a “stage certificate” issued by the builder certifying that the appropriate instalment event has taken place.
 ?。╥i) prior to each instalment event, the builder shall notify the buyer, in writing, of the amount of any reduction in, or addition to, the contract price, in accordance with the terms of this contract. the instalment due on the forthcoming instalment event shall be adjusted to take account of any such amendment to the contract price.
  4) the amount of each instalment of the contract price shall be paid direct to aaa‘s yacht company limited, a/c number 0842-5094 at citibank hong kong, (routed via citibank ny, aba # 021000089, a/c citibank hk, chips uid 030339, swift code citihkhx) for the account of the builder within fourteen banking days of the due date for payment and if not so paid shall (without prejudice to any other rights of the builder in respect of non-payment) bear interest from the due date until payment at hk base rate plus 4%.
  5) in the event of the builder issuing a stage certificate under (3) (i) and the buyer considering that the builder should not have issued the same because the instalment event shall not have been reached, or, if reached, that the work or materials executed or incorporated by the builder in the yacht was not in accordance with the requirements of this contract or in accordance with good engineering practice then the buyer may give a counter notice specifying the matters by reason whereof the buyer contends that the stage certificate should not have been issued, and thereupon if the parties do not agree then the matter shall be referred for resolution to an arbitrator to be agreed by the parties.
  article vi – property
  1) the yacht as she is constructed, and all machinery and equipment and materials, whether wholly or partially finished or unfinished, from time to time appropriated or intended for the yacht in the boatyard or elsewhere, shall be and remain the absolute property of the buyer (and shall be at the risk of the builder) and shall be within the ownership and disposition of the buyer. the builder shall, however, have a lien upon the craft, machinery and equipment and materials for recovery of all sums due under the terms of this agreement or any variation or modification thereof.
  2) the builder will co-operate with and give all reasonable assistance to the buyer in relation to the measurement and registration of the yacht.
  article vii – insurance
  1) during the period of construction under this contract and until delivery of the yacht in accordance with article ix, the yacht and all materials, machinery and equipment allocated for the construction thereof and all items of buyer‘s supply actually delivered to the builder shall be at the risk of the builder, who shall at its own expense keep the same insured for a sum not less than 110% of the aggregate sum of the contract price plus the value of the items of buyer’s supply with an approved insurer or insurers and in respect of and against all ordinary yacht building risks, being fire, storm, theft, flood, lightening, explosion, docking, undocking, launching, salvage, removal of wreck, strikes, civil commotion, malicious damage, sabotage and vandalism.
  2) buyers supply items will be delivered to the builder at xinhui port, at which point the risk for the items will pass to the builder.
  3) a certificate of insurance showing that the necessary cover is in place shall be delivered to the buyer if so required.
  4) in the event of an actual, constructive, compromised or arranged total loss of the yacht prior to delivery of the same to the buyer, either the buyer or the builder shall be entitled to terminate this contract by serving up on the builder or the buyer, as the case may be, written notice of termination, such notice to be dispatched within fourteen days of the date upon which the insurers accept that the yacht has become an actual constructive, compromised or arranged total loss.
  5) in the event of any loss or damage being sustained by the yacht prior to delivery which does not constitute an actual, constructive, compromised or arranged total loss, the builder shall repair and make good that loss or damage (hereinafter referred to as a ‘partial loss’) at the cost of the builder and whether or not sufficient insurance funds may be available.
  6) the proceeds of the insurance referred to in paragraph (1) of this article shall be dealt with as follows:
  if the insurance proceeds are in respect of an actual or constructive or compromised or arranged total loss then they shall be applied firstly in reimbursement to the buyer of the amount of all payments, if any, made by the buyer to the builder under this contract and in reimbursement of the value of any items of buyer‘s supply and, secondly, in payment of any balance to the builder.
  7) following delivery of the yacht, the buyer shall accept all risk in the yacht including all materials, machinery and equipment thereof, and the buyer shall at its own expense be responsible for all insurance risks thereafter.
  article viii – tests
  1) prior to delivery of the yacht to the buyer, the builder shall carry out the tests provided for in the quality documentation, including but not limited to: a) noise and vibration
  b) hose and pressure tests
  c) motoring trials within the confines of the west river.
  2) the builder shall give the buyer reasonable written notice of the time and place at which each of the tests is to be carried out.
  article ix – delivery
  1) the yacht shall be delivered to the buyer by the builder at a mutually agreed place in hong kong harbour on or before the contract delivery date, or as the said contract delivery dates may have been extended in accordance with the provisions of articles iii or iv.
  2) provided that all instalments and other sums as set out and contained in article v are fully paid then the delivery of the yacht shall be effected forthwith by the concurrent signature by the buyer and the builder of a certificate of delivery and acceptance acknowledging delivery of the yacht by the builder and acceptance thereof by the buyer provided that the signature thereof by the buyer shall not operate as a waiver of any rights which the buyer might otherwise have in respect of the yacht. 3) upon delivery, the risk in the yacht delivered shall pass to the buyer, it being expressly understood that, until delivery is effected, the yacht and their equipment are at the entire risk of the builder.
  4) the buyer shall take possession of the yacht immediately upon delivery.
  5) if the builder is unable to tender the yacht for delivery within sixty days (‘the period of grace’) of the contract delivery date, the builder shall pay to the buyer as agreed and liquidated damages the sum of us$100 for each day the yacht is not so tendered for the first thirty day period of delay after the period of grace, then us$250 for each subsequent day the yacht is not so tendered and until satisfactory delivery is made.
  6) if any items on the yacht are incomplete when that yacht is otherwise ready for delivery and the buyer and the builder agree that such items do not materially affect the operation of the yacht nor are likely to cause damage or deterioration, then the buyer will not unreasonably withhold its consent to take delivery of the yacht subject to the right of the buyer to have such items completed in a manner to be mutually agreed upon in writing between the builder and the buyer and at the cost of the builder.
  article x – default of the builder
  1) the builder shall be in default and this contract may be terminated by the buyer by notice in writing to the builder if at any time before delivery of either yacht: a) the builder without just cause refuses to proceed with the construction of the yacht;
  b) an order is made or an effective resolution is passed for the winding up of the builder or a receiver or administrator is appointed of the whole or any part of the undertaking of the builder or;
  c) the buyer is entitled to reject the yacht under article iii sub para 5 and if the builder does not rectify the defect or omission in a reasonable time.
  d) it shall become apparent during the period allowed for construction of the yacht that the builder shall be two months in arrears in relation to the critical build chart (such arrears not being in respect of force majeure) in respect of the yacht.
  2) in the event of the buyer terminating this contract in accordance with paragraph (1) of this article, the buyer shall be entitled to take possession of the yacht in its unfinished state and complete the same, or have the same completed, elsewhere at a mutually agreed cost.   the costs incurred by the buyer in completing the yacht including all costs of transportation and insurance shall be deducted from the remaining instalments of the contract price. if the said costs shall exceed the amount of the remaining instalments of the contract price, the builder shall pay the difference to the buyer.
  3) upon the buyer taking possession of the yacht, in terms of the foregoing paragraph(a) the property and risk in the yacht and all its materials, machinery, apparatus, outfit and equipment shall pass to the buyer, and (b) save as provided in paragraph (2) all the obligations, duties and liabilities of each of the parties to the other, under this contract, shall forthwith be completely discharged.
  4) when any sum is payable by the builder to the buyer by way of liquidated damages pursuant to the provisions of this contract, payment shall be made within fourteen days of delivery (and not deducted from sums due to the builder on delivery) and shall be in full and final satisfaction of all claims on behalf of the buyer in respect of the matters which gave rise to the payment, without prejudice, however, to any other claim of the buyer in respect of matters other than delay.
主站蜘蛛池模板: 国产人与动牲交_老牛嫩草一区二区三区日本_性欧美日本_欧美成人在线免费视频_日本WWW一道久久久免费榴莲_丰满少妇A级毛片露出偷拍_国产无码一区二区精品_欧洲裸体兽交大黑妞 | 手机看片一级片_人人妻人人爽人人澡人人_亚洲成AV人片在一线观看_在线精品自偷自拍无码_中文字幕一区二区三区在线播放_日本中文字幕视频一区_国产不卡精品_99精品久久久久久久另类 | 色视频中文字幕_亚洲性色成人av_外国黄色一级毛片_亚洲国产wwwccc36天堂_国产日韩精品久久久无码专区_久草精品视频在线观看_国产欧美精品aaaaa久久_精品国产一区二区在线观看 | 特一级黄色_日本三级视频_国产91欧美_伊人午夜_午夜免费性福利_超碰在线人人草_亚洲日韩国产精品乱-久_中文字幕精品亚洲无线码VR | 亚洲性色av日韩在线观看_国产成人精品无码片区在线观看_国产精品操女人_av官网在线播放_国产内射露脸在线观看_久久2018_日韩97_国产精品毛片久久久久久久av | 久久婷婷五月国产色综合_免费的日本网站_a级a一片_国产一级片免费观看_亚洲免费av在线播放_yourporn精品视频入口_国产精品一区二区三区网站_欧美性bbbbbxxxxxhd | 久在草视频_乱码一区二区_飘雪在线高清观看视频动漫_日本高清视频免费在线观看_久久亚洲一区二区三区四区_亚洲欧洲av在线_精品国产AV无码一区二区三区_免费黄色在线观看视频 | 国产欧美亚洲一级激情在线观看_亚洲情视频_国产性猛交_国产又色又刺激高潮免费视频_在线亚洲天堂_久久精品人人做人人爽97_国产精品爽爽爽爽爽爽免费观看_中文字幕在线视频免费 | www.com草逼_视频在线观看亚洲_麻豆传媒影院_久草这里只有精品_九九99靖品_亚洲1区1区3区4区产品乱码芒果_狠狠色狠狠色综合日日小蛇_亚洲欧美中文日韩在线v日本 | 亚洲人成在线免费观看_男女扒开双腿猛进入免费看污_国产公妇仑乱在线观看_亚洲va欧美va国产综合先锋_国产精品一区二区av片_久久国产精品欧美_久久午夜国产精品www护士让_玩偶姐姐免费 | 18av在线播放_999亚洲国产996395_久久视讯_国产精品久久久久久99_欧美性19_欧美亚洲韩国国产综合五月天_玩弄CHANEL妇熟女_起碰免费公开97在线视频 | 日日骚久久_91老肥_欧美精品福利_日本精品无码久久久久三级国产_亚洲AV综合AV一区二区三区_午夜理理伦A级毛片_解开人妻的裙子猛烈进入_亚洲综合在线视频 | 人成亚洲_体内射精日本视频免费看_日韩久久网站_日本黄色美女网站_国产在线喷浆_bbbbbxxxxx欧美性_4虎最新_欧美又大又色又爽bbbbb片 | 性欧美videosex18嫩_久久综合久久网_日韩成人视屏_国内精品51视频在线观看_91丨九色_中文字幕av在线播放_国产成人一区二区三区免费_6699嫩草久久久精品影院竹菊 | 久久久999免费视频_无码写真精品永久福利在线_91插插插影院_免费黄色高清视频_果冻传媒视频一二在线观看_高清二区_大内密探零零灵性_成人欧美国产 | 在线观看91精品国产麻豆_少妇p毛又多水又大又黑_超碰91人人_segui88久久综合_国产JIZZJIZZ麻豆全部免费_国产精品一区二区三区av麻_色多多污_四虎www4hv | 大地资源网高清视频怎么在线_免费看片在线观看网站_一级久久久久久久_久久人人爽人人爽人人片ⅴ_a片欧美激情肉欲高潮_亚洲国产日韩在线_最新av在线播放_a级免费视频 | 久久精品无码一区二区小草_国产精品一区二区三区在线观_色五月最新网址_h免费看_一a本v道久久_国产日日操_亚洲无线观看国产高清_日本三级黄色录像 | 久久亚洲中文字幕不卡一二区_日日操综合_一区二区精品区_欧美一级片在线免费观看_亚洲毛片不卡AV在线播放一区_谍战剧《惊弦》在线观看免费高清_亚州中文无码aⅤ在线_国产午夜福利精品集在线观看 | 94久久国产乱子伦精品免费_国精品产区WNW2544_午夜黄色av_久久精品视频在线播放_日韩视频一二三区_天天干干干_国产在线精品91国自产拍免费_国产三级啪啪 | 久热这里只有精品12_麻豆国产在线视频_国产日韩欧美精品一区_成年片色大黄全免费网无需安装_久久伊人少妇熟女大香线蕉_在线不卡中文字幕一区_欧美大胆丰满熟妇XXBB_国产精品久久中文 | 国产午夜精品久久久久久久_亚洲欧美精品久久_久久久999国产_亚洲国产精品无码7777一线_有码av在线_日韩精品区_亚洲第一色片_免费va欧美在线观看 | 亚洲最大成人av_国产精品一品二区三区在线观看_免费看a毛片_终极斗罗4第三季免费播放_国产乱码精品一区二区三区中文_四虎影院4hu_91精品国产综合久_国产男女视频在线 | 北条麻妃中文_eeuss影院www影院入口_亚洲视频在线观看一区_最新日韩视频在线观看_久久久久久久久久亚洲_天天操网址_久久成人无码影片_免费无码又爽又刺激高潮 | 亚洲精品无码成人A片体验区在线_精品无码一区二区三区亚洲桃色_国产九九久久_国产乱精品一区二区三区视频了_淫片网站_少妇人妻一级a毛片_天天干天天射综合网_1769国内精品视频在线 益日韩欧群交P片内射中文_1313午夜精品理论片_综合爱爱网_纯肉无遮挡h肉动漫在线观看3d_男人的天堂久久精品_99久久精品午夜一区二区_亚洲七七久久桃花影院_国产91色在线亚洲 | 青青草99啪国产免费_欧美与欧洲交xxxx免费观看_亚洲欧美日韩v在线观看不卡_成人91污污污在线观看_亚洲永久免费网站_亚洲视频一区二区三区_日韩在线视频在线观看_亚洲国产精品精华液网站 | 最新久久精品_91无限看次数破解版小孩_久久久久久久久爱_久久久亚洲一区_一级网站_免费精品久久久_玩弄丰满熟妇XXXXX性视频_中文字幕久久爽aⅴ一区 | 97影院手机在线观看_欧美乱淫_亚洲欧美精品无码一区二区三区_亚洲成色A片77777在线麻豆_久久99国产综合精合精品_骚虎av在线网站_色资源AV中文无码先锋_国产a1区 | se69色成人网wwwsex_午夜av免费_亚洲高清av_久久久久免费毛A片免费_四虎影院永久_男人一边吃奶一边弄下边好爽_国产91对白刺激露脸在线观看_欧产日产国产精品精品 | 色噜噜久久综合伊人一本_伊人久久丁香色婷婷啪啪_久久狠狠爱亚洲综合影院_日韩一级免费观看_日本内射FREERAPE视频_国产欧美一区二区精品秋霞影院_亚洲一区国产二区_中文字幕一二三综合a | 扒开双腿猛进入校花免费网站_97超级碰碰碰久久久久_www.亚色太在线.com_2023av在线_一级精品视频_亚洲国产成人精品无码一区二区三区_久久高清免费_免费视频网站91 | www.成人_亚洲人成网77777亚洲色_色播国产_国产免费一区二区三区视频天天爽_8av国产精品爽爽ⅴa在线观看_亚洲无毛av_成人AV毛片无码免费网站_国产V一区二区三区在线 | 日韩免费无码专区精品观看_久久久久久久久久久久久久免费看_18av千部免费影片与您_日本天堂在线视频_空姐毛片_香蕉私人影院_黑人巨茎大战白人美女_国产成人av免费观看 | 久久久精品一区_人人爽天天碰天天躁夜夜躁_亚洲精品网页_97一期涩涩97片久久久久久久_www亚洲一区_久久久精品无码中文字幕_爱草草视频_国产伦国产伦老熟300部 | 亚洲视频一区二区三区四区_一级全黄视频_干逼毛片_懂色av一区二区三区四区五区_69视频免费看_久久国产精_青草视频免费_青青青在线播放视频国产 | 国产V亚洲V天堂A无码99_午夜伦理av_国产精品久久久久9999小说_亚洲人线精品午夜_视频一区国产_亚洲精品午夜久久久久久久久久久_欧美色视频综合在线观看_国产精品成人影院在线 | 亚洲欧美日本国产高清_欧美大逼逼_亚洲一区二区三区四区在线_亚洲精品色_亚洲三区在线_黄色av网站免费在线观看_a级性视频_纳粹荒淫史 | 无码高潮喷吹在线播放亚洲_日本午夜在线视频_国产免费牲交视频_久久精品区_日日夜夜精_亚洲国产精品激情在线观看_亚洲sm另类一区二区三区_精品久久影视 | 密室大逃脱第三季免费观看高清_久久国产亚洲中文字幕_欧美成人gv在线观看_国产一级淫片91aaa激情_一区国产传媒国产精品_日本一区二区三区在线免费_亚洲欧美国产日韩中文字幕_亚洲成av片人久久久 | 亚洲精品久久久蜜桃网尤妮丝_日日日日日_亚洲一区h_国产网站在线免费观看_精品999日本久久久影院_女教师在办公室被强在线播放_在线视频久_夜夜骑天天射 | 少妇作爱视频在线观看视频_亚洲视频自拍_国产精品乱码在线_国产精品一区久久_国产成人免费高潮激情视频_午夜精品一区二区三区在线观看_婷婷丁香五月综合色_亚洲色中文字幕在线播放 |